Kepu Consultationkepu home
HomeAboutMain businessCasesContactNews & Insights
Menu
HomeAboutMain businessCasesContactNews & Insights
Kepu Consultation

Systems, layout and lean improvement

Zhejiang Kepu Enterprise Management Consulting Co., Ltd.

About Kepu

About
Client voices
Culture
Careers

Business

Project Consulting
Cases
Partnerships

News & Insights

News
Short Videos
Suggestions

Follow Us

Add Mr. Zhang on WeChat
Kepu Consultation on WeChat

Contact

13088668928Room 1605, Vanke Yue Shang Building, Wenzhou, Zhejiang Province, China.
© 2026 Zhejiang Kepu Enterprise Management Consulting Co., Ltd.浙ICP备12026810号-10浙公网安备33030202002479号

SERVICE

Factory Layout Planning

Bring capacity, processes and logistics into one practical factory layout.

Services/Factory Layout Planning
OverviewExplore servicesGetting startedKnowledge

Project overview

A factory layout needs to reflect how production actually works. Kepu starts with products, capacity, processes and site constraints, reviewing equipment, storage, people and material flows together before a new build, relocation or renewal.

Organize the flow before allocating space

Compare layout options through production rhythm, material movement and relationships between areas. Balance current operating needs with room for future adjustment.

Connect the plan with implementation

Depending on the project, clarify zoning, equipment and material locations, routes, visual management and phased implementation. Agree the scope and level of detail before work begins. Statutory design and approvals remain with the appropriate qualified parties.

Explore the services
Factory Layout Planning
Illustrative service setting

Start with the situation you face

Clarify the need and scope before agreeing on an approach that fits the business.

  1. Share the context

    Describe your business, current challenge and the outcome you need.

  2. Agree the scope

    Discuss available information, timing, responsibilities and expected outputs.

  3. Plan the work

    Define tasks, communication points and reviews in the agreed project plan.

Find the right service

Choose a service to explore the approach and useful information to prepare.

Greenfield Projects

Greenfield Projects

For greenfield projects, translate the business plan into spatial requirements early. Review products, target capacity, processes, storage, supporting areas and logistics as inputs to detailed design.

How the work is approached

Assess site constraints and needs, analyze flows and area requirements, compare overall and workshop layouts, and clarify equipment, utility and phasing interfaces.

Useful information to prepare

Site information, product and capacity plans, process flows, equipment lists, storage needs and construction schedule.

Read the full topic
Factory Renewal

Factory Renewal

Existing-factory renewal starts with operating problems and physical constraints, examining handling, waiting, space usage and crossing flows within the current building and equipment arrangement.

How the work is approached

Review layouts and logistics, identify bottlenecks and constraints, compare options and consider downtime windows, relocation sequence and production continuity.

Useful information to prepare

Current plans, equipment and storage information, logistics routes, main bottlenecks and permitted downtime.

Read the full topic
Visual Management

Visual Management

Visual management makes workplace rules easy to understand and follow through clear zoning, locations, signs and operational information.

How the work is approached

Review how areas are used; plan route and zone signs, equipment and material locations, and production or quality boards. Define ownership and update routines.

Useful information to prepare

Site photos and plans, area uses, existing signs, information needs and responsible roles.

Read the full topic
1 / 3

Service Knowledge

Explore standards, practical methods and service knowledge in depth.

04
新工厂规划:画布局图之前,先确认六类输入
2026.09.29

Six inputs to confirm before a new-factory layout

Products, capacity, processes, equipment, logistics and site constraints establish a reliable planning brief.

老工厂改造:让搬迁顺序服从交付节奏
2026.09.29

Factory renewal: phase the move around delivery commitments

Plan temporary flows, verified cutovers and recovery conditions around existing structures, equipment and orders.

目视化管理:让异常能够被看见和处理
2026.09.29

Visual management: make abnormalities visible and actionable

Connect location standards and visible status with a clear response routine.

AGV与智能立库规划:先打通接口,再选择设备

Service Topics

Explore individual services, preparation and related knowledge.

Greenfield Projects→Factory Renewal→Visual Management→
2026.09.29

Planning AGVs and automated storage: define the interfaces first

Assess automation through transport tasks, load carriers, inventory rules and exception recovery.